
Understanding Solar Installation in Bangalore and Its Benefits
1. Basics and Suitability
Is solar worth it in Bangalore? Yes, for most homes with a usable roof. Bangalore gets good sunshine for most of the year, and BESCOM domestic tariffs are high at higher consumption slabs, so each unit you generate saves a lot. Payback is typically around 4 to 6 years for a subsidised residential system.
How much power will solar produce in Bangalore? A rough rule is 4 units (kWh) per kW per day, or about 1,300 to 1,500 units per kW per year. A 3 kW system produces roughly 12 units a day. Output drops during the monsoon (June to September) and peaks in February to May.
Is Bangalore’s cloudy or rainy weather a problem? Not seriously. Panels still produce in diffuse light, though at lower output. Annual yield is what matters, and Bangalore’s is good.
How much roof space do I need? Roughly 10 sq m (about 100 sq ft) of shadow-free area per kW, so a 3 kW system needs about 30 sq m. Terrace water tanks, staircase headrooms, parapet walls and neighbouring buildings can all cause shading.
Can I install solar on a rented house or an apartment?
- Rented house: you need the owner’s written NOC, and the subsidy applies to the electricity account holder.
- Apartment: an individual flat usually can’t, since the roof is common property. Options are a system for common areas through the RWA or society, or group or virtual net metering where allowed.
My roof is sloped, sheet or shaded. Can I still go solar? Sloped roofs work with mounting structures. Metal sheet roofs work with clamp-on mounts. Heavy shade lowers output, so ask for a shadow analysis. Microinverters or optimisers can help in partial-shade cases.
Which direction should panels face? South-facing is best in India, tilted at roughly 10 to 15 degrees in Bangalore. East or west facing still works with a small loss.
2. System Size and Type
What size system do I need? Divide your average monthly units by about 120 per kW. Examples:
- 150 units/month: about 1.5 to 2 kW
- 250 to 300 units/month: about 3 kW
- 500+ units/month: about 5 kW or more
Check the last 12 months of bills, not just one.
What’s the difference between on-grid, off-grid and hybrid?
- On-grid: connected to BESCOM, no batteries, and the cheapest and most common option. It shuts down during a power cut for safety.
- Off-grid: batteries only, with no grid export. It is costly and mainly used where there’s no reliable grid.
- Hybrid: grid plus batteries. It gives backup but costs more.
Will my solar system work during a power cut? A standard on-grid system will not. It must switch off when the grid is down. For backup you need a hybrid inverter with batteries.
Should I add a battery? Bangalore has relatively reliable power, and batteries add a lot of cost and need replacing every 8 to 12 years or so. Add one only if you face frequent outages or want backup for essentials. Batteries are generally not covered by the central subsidy.
Should I size above 3 kW if I use a lot of power? Possibly, if your consumption justifies it. Subsidy is capped at 3 kW, so a 5 kW or 10 kW residential system still receives a maximum central subsidy of ₹78,000. Larger systems have a longer payback on the extra kW but still save money if your bills are high.
Are there size limits for net metering? Net metering size is capped at your sanctioned load or contract demand if that is lower (KERC DSPV Regulations 2026, Reg 4.1.2). If your sanctioned load is low, ask BESCOM about enhancing it first. KERC’s draft rules also proposed mandatory storage for systems above 10 kW, so check the final position if you plan a large system.
3. Cost, Subsidy and Financing
How much does a home solar system cost in Bangalore? Typical rough ranges before subsidy are:
- 2 kW: ₹1.2 to 1.4 lakh
- 3 kW: ₹1.6 to 1.9 lakh
- 5 kW: ₹2.5 to 3.2 lakh
Costs vary with panel brand, inverter, structure and roof type. For comparison, one 2026 report cited a 3 kW system in JP Nagar with a gross cost of ₹1,65,000.
What subsidy can I get? Under PM Surya Ghar, the central subsidy is ₹30,000 per kW for the first 2 kW, plus ₹18,000 for the third kW. That means ₹30,000 for 1 kW, ₹60,000 for 2 kW, and ₹78,000 for 3 kW or more.
Does Karnataka add its own subsidy? As of mid-2026, one source reports that Karnataka has no separate state-level top-up subsidy for residential rooftop solar under PM Surya Ghar, unlike Gujarat or Rajasthan. Check the PM Surya Ghar portal and KREDL for any new announcements.
Who is eligible for the subsidy? Broadly, you must:
- Own a house with a suitable roof
- Have a valid, active electricity connection
- Not have availed any other rooftop solar subsidy
You also need a bank account (Aadhaar-linked for direct transfer) and must use a vendor registered on the national portal. The subsidy is one per electricity connection.
When do I receive the subsidy, and how? It is paid by direct bank transfer after installation, inspection and net-meter commissioning. Timing varies, so ask your installer how long recent customers have waited.
Do I pay the full amount upfront? Usually you pay the installer the full cost or an agreed milestone schedule, and the subsidy is credited to your account later. Some installers or banks offer arrangements that adjust for the subsidy, but confirm the terms in writing.
Are there loans for rooftop solar? Yes. Several public sector banks offer low-interest loans for residential rooftop solar under the PM Surya Ghar scheme, and some private lenders and NBFCs offer them too. Ask your bank about interest rate, tenure and whether collateral is needed.
Is there GST on solar? Solar systems have attracted a concessional GST rate, but rates and invoicing structure (supply plus installation) can change. Ask the installer to show GST separately on the quote.
What is the payback period? It depends on system size, your tariff slab and how much you consume. Typical subsidised residential payback is about 4 to 6 years, and systems last 25 years or more. Ask the installer to show payback using your actual bill, not a generic figure.
4. Savings, Billing and Net Metering
How much will my bill reduce? A well-sized system can cut your energy charges sharply, sometimes to near zero over the year. Fixed charges and taxes remain, so the bill rarely drops to exactly zero.
What is net metering? BESCOM installs a bidirectional meter. Solar power you use directly offsets your consumption. Surplus goes to the grid and is credited to you. At the end of the billing period you pay only for net consumption.
What is gross metering, and which should I choose? Under gross metering, all the solar power goes to BESCOM at a fixed tariff, and you keep buying grid power at the normal rate. Net metering is generally better for homes because you offset power at your retail tariff, which is higher than the export rate. Under KERC’s earlier order, consumers got a one-time irrevocable option of gross or net metering when signing the PPA. The 2026 regulations allow one switch of mechanism during the project’s life, so read the current terms before choosing.
What does BESCOM pay for exported or surplus units? KERC’s August 2026 tariff order revised solar tariffs, which range from ₹1.96 to ₹3.89 per unit across residential and distributed projects. The rate applying to your category and mechanism is in the KERC order on the BESCOM portal. Don’t rely on figures quoted by salespeople without checking it.
How long do the tariffs stay fixed? The order’s tariff remains applicable until 30 June 2029, or until further orders. Your PPA with BESCOM typically runs for 25 years, so ask what your PPA says on rate and revision.
Do I still get a bill after installing solar? Yes, BESCOM still issues a bill showing import, export and net units, plus fixed charges and taxes. Surplus credit carries forward under the settlement rules in force.
5. Approvals and Process
What is the step-by-step process?
- Check roof, shading and your bills
- Get 2 to 3 quotes from empanelled vendors
- Register on the PM Surya Ghar portal and apply
- Apply to BESCOM on the rooftop solar portal (srtpv.bescom.org)
- Install the system
- Upload the work completion report
- BESCOM inspects, installs the net meter and commissions
- Subsidy is released after verification
How long does the whole process take? Installation usually takes 1 to 3 days. Approvals, meter installation and subsidy processing take most of the time. One source estimates BESCOM approval at 15 to 30 days, plus another 30 to 45 days for net metering and portal verification. Allow 1 to 2 months overall, longer in busy periods.
Do I need BESCOM approval before installing? Yes, apply first. For systems up to 150 kW, the application itself is the approval to start work. You then have 150 days to upload the work completion report, and BESCOM has a 5 working day inspection and commissioning window after that.
Do I need a separate net meter? Yes. Meters must come from BESCOM-approved or empanelled vendors. Your installer usually handles this.
Who should I buy from? Choose a vendor registered on the PM Surya Ghar portal and preferably KREDL-empanelled. If you want the subsidy, the vendor must be on the national portal.
Do I need permission from my apartment association or neighbours? For an independent house, no. For shared roofs in apartments, you need the association’s approval.
6. Equipment and Quality
Which panels are best? Mono PERC and TOPCon are common now. Choose a reputed manufacturer, check the BIS or MNRE-compliance requirements for subsidy, and ask for datasheets. Subsidised systems have to use domestically manufactured modules (DCR), so confirm that your quote says so.
What is the warranty? Typical terms:
- Panels: 10 to 12 year product warranty and a 25 to 30 year performance warranty
- Inverter: 5 to 10 years
- Installation workmanship: ask for at least 5 years in writing
How long do panels and inverters last? Panels last 25 years or more, losing roughly 0.5 to 0.7% efficiency a year. Inverters usually need replacing once, around year 10 to 12.
Which inverter should I choose? String inverters are common and cost-effective. Microinverters suit shaded or multi-orientation roofs. Pick a reputed brand with local service support.
Is there a risk of fire or electric shock? Properly installed systems are safe. Insist on proper earthing, lightning arrestors, surge protection, DC and AC isolators and quality cabling. Poor installation is the real risk, so choose a trusted installer.
Will my roof leak or get damaged? Good installers use proper structures, and drilling is minimal on RCC roofs when they use ballast or anchor-based mounts. Ask what waterproofing they provide if the roof must be drilled.
Can panels withstand Bangalore rain, wind and hail? Yes, certified panels are tested for wind and hail. Check that the structure is rated for the wind load in your area.
7. Maintenance and Operations
How much maintenance does solar need? Little. Clean the panels every 2 to 4 weeks, more often in dusty or construction-heavy areas, and have a yearly electrical check.
How do I clean the panels? Use water and a soft cloth or squeegee in the early morning or evening, never on hot panels. Avoid abrasive materials and harsh chemicals. Hire help or ask the installer if the roof is hard to reach.
How do I know it’s working properly? Most inverters have an app or display showing daily generation. Compare actual output with your expected figure of about 4 units per kW a day, and look for a sudden drop.
Who do I call if something breaks? Get the installer’s service commitment in writing. For the net meter or grid issues, contact BESCOM. Keep a record of equipment serial numbers and warranty documents.
What happens in monsoon or during construction nearby? Output falls in the monsoon, and dust from nearby construction can cut yield. More frequent cleaning helps.
8. Money, Risk and Legal
What happens if I sell my house? The system stays with the property. The net-metering agreement can be transferred to the new owner through BESCOM’s procedure, and a solar-equipped house can add resale appeal.
Can I add more capacity later? Usually yes, within your sanctioned load limit, but a new application is needed. The subsidy covers one installation per connection, so size carefully at the start.
Does solar affect my home insurance? Inform your insurer. Many cover rooftop solar with a small addition to your policy.
Are there any hidden charges? Ask the installer about:
- Meter charges and testing fees
- Structure modifications for sloped or sheet roofs
- Extra cabling for long runs
- Civil work, such as raised structures
- Inverter replacement and any annual maintenance contract
How do I avoid solar scams?
- Never pay the full amount before work starts
- Verify the vendor on the PM Surya Ghar portal
- Don’t trust “free solar” or “guaranteed zero bill” claims
- Use only official URLs, since many fake subsidy sites exist
- Never share OTPs or bank details with callers claiming to arrange your subsidy
- Get a written quote listing brand, model, warranty and payment schedule
What should my quote include?
- System size and component brands and models
- DCR status of the panels
- Price breakdown with GST
- Payment schedule and timeline
- Warranty terms and service commitment
- Who handles BESCOM and subsidy paperwork
- Net meter and approval responsibilities
9. Environmental and Other
What’s the environmental benefit? One source estimates each kW avoids about 1.5 tonnes of CO₂ a year, so a 3 kW system saves roughly 4.5 tonnes annually. Treat this as a rough, grid-dependent figure.
What happens to panels at end of life? Panels are recyclable, though India’s recycling infrastructure is still developing. Ask your vendor about take-back options.
Can I charge an EV from solar? Yes. Daytime charging directly offsets your solar generation, and net metering credits help the rest. Size the system to cover the extra load.
Can I go solar and still use my existing UPS or inverter? Yes. On-grid solar works alongside your existing backup. A hybrid inverter can replace both if you want solar-based backup.
Quick Checklist for Customers
- Gather the last 12 months of BESCOM bills
- Check shadow-free roof area (about 10 sq m per kW)
- Get 2 to 3 quotes from portal-registered vendors
- Verify the subsidy and BESCOM steps on the official portals (pmsuryaghar.gov.in and srtpv.bescom.org)
- Pay in stages and get all warranties in writing
Subsidy amounts, KERC tariffs and BESCOM procedures can be revised. Verify the current terms on the official portals before signing, and treat cost and savings figures here as estimates.


